With Aden Telecommunication Project Work Achieved:
External line plant network (civil) for Four Main District Crater -Al-Malla – Khormaksar And Al- Mansoora And Linking The Four- District Together.
Work Achieved Was:
- Trenching In Sand And rocky
- Fixing Pipes Line in Trenches And back-filling comp
- Constructing The Manhole at Sites Or placing pre-cast Manhole 24
- Pulling the Primary Telecommunication Cables in ducts 40
- Pulling the Fiber-Optic Cables in ducts 80
- Fixing the Cabinet and distribution boxes.
- Laying secondary cables in trenches 60
- Laying secondary cables in trenches 60