Aden Distripark) Aden Free Zone Infrastructure project & utilities

With M/s Shafa Contracting and Trading.

  1. The implementation of the sewerage network & sewage treatment system Aden Free Zone which consist of Sewer line from 3m to 7m deep with pump sump 9m deep with connecting main and secondary manholes and sewage treatment plant facilities.
  2. The implementation of the water network with 315mm pipe diameter and 2m deep with fixing of main valves, plot connection, fire h
  3. The implementation of the electric cables network, which consist of high voltage and low voltage for the infrastructure of the industrial zone Caltex
  4. The implementation of the telephone cables network with all the necessary connection in Aden container

The implementation of the CCTV cables network with all the necessary connection in Aden container terminal.